Tag Archives: Mining

1. Metals
2. Oil shale
3. Gem stones, Limestone, Dimension stone
4. Rock salt
5. Potash
6. Gravel
7. Clay

Business opportunity in Bolivia – copper mine

We are looking for a business partner to explore a copper mine of 77 000 t excavation material containing 0.79 % copper and a proportion of gold.

The copper is obtained by pumping water into the copper stratum and the soluble copper together with the gold proportion is washed out through drill holes leading to the copper stratum.

Please contact

Michael Patotschka
Düsseldorfer Straße 74
47051 Duisburg
Germany

Phone +49 173 7692688
Email   mpts@gmx.net

Facebooktwitterredditpinterestlinkedinmail

General constructors wanted

We are looking for general constructors (also as EPC contractors) for the following projects:

  • Zinc processing plant (Bolivia)
  • Gold mining (Brazil)
  • Tube manufacturing plants (big diameter tubes and tubes for housing) (Bolivia)
  • Manufacturer of photovoltaic plants (Bolivia)
  • Dams and hydroelectric power stations (Bolivia)
  • Wind turbines and wind power stations (Bolivia)
  • Building of overhead power transmission lines (Bolivia)
  • General contractors for hospitals (Bolivia)

Please contact

Michael Patotschka
Düsseldorfer Straße 74
47051 Duisburg
Germany

Phone +49 173 7692688
Email   mpts@gmx.net

Facebooktwitterredditpinterestlinkedinmail

Angola restores to former position

Angola is one of the fasted growing economies in the world. It has estimated reserves of 10 billion barrels of oil, and is the fourth largest producer of diamonds in the world; has million hectares of arable land; many valuable minerals and one of Africa’s largest water reserves.

This country was once the world’s fourth largest coffee producer, a major iron ore producer and an exporter off high-quality marble , food and sisal. Now, following the advent of peace, the GoA plans to restore Angola to its former position in the global economy. Inflation has been extremely stable in recent years, and continues it’s downward trend while the exchange rate has stabilized.

With record oil prices and production, the GoA has rightfully seized this opportunity to diversify the country’s economy and promote private investment. the GoA has attempted to accomplish this challenge through policy reforms, particularly, the establishment of development zones. There are early indications that these reforms have had some success in improving the business climate and increasing investor confidence in the country. To this point, Angola has received lines of credit from China, Brazil, Portugal, Germany, Spain, France and the E.U. GoA is offering incentive packages based on development zones.

Since signing the latest peace agreement in early 2002, Angola has experienced 6 years of sustained stability and growth that has been critical to its development and growth. In the past three years, the country has embarked on an ambitions reconstruction program. Luanda, the capital of Angola, has characteristics of a city with a great development potential. The Government of Angola (GoA) views civil construction as the country’s top priority within this new socio-economic context. Several buildings are being built in various points of the capital. Many of the provinces outside of Luanda are also developing through expanding necessary infrastructure to better connect the country.

Facebooktwitterredditpinterestlinkedinmail

Zimbabwe gold mine

Zimbabwean company with licences, equipment and accomodation facility. Currently production is based on custom milling (also called toll milling) generating a positive cashflow. For the mine to reach its full potential, there need to be additional exploration and additional capital invested, possiby in a step-by-step model. The mine has not been fully developed due to the countrys’ not yet functioning capital markets. There is extractable sand dumps but main focus is underground and possibly open pit mining on site.

Previous exploration has given indications of resources of at least 600-1200 kg at 4-6 g/t in average. The 120 000 tons of Gold sand residues is giving 0.65-1.0 g/t, estimated to be profitable at extraction. New tailings generated from custom milling gives about 2.5 g/t.

On mining site, owned by the company, we find basic gold mineral processing equipment suitable for small scale operations, 2 wheled tractors, one tracked tractor, on site lab, with AA machine, satellite broadband internet, Cat 920bl excavator and 4 bed room managers house and employee housing.

The mining licences cover 100 ha and has an identified strike length of at least 1.5 km. Two parallell reefs have been identified and also, with high possibility, a footwall parallel zone.

The current on going small scale operation custom milling is generating positive net revenues.

Exploration was carried out 2011; additional exploration is needed:

Please contact

Michael Patotschka
Düsseldorfer Straße 74
47051 Duisburg
Germany

Phone +49 173 7692688
Email   mpts@gmx.net

Facebooktwitterredditpinterestlinkedinmail